← Coverage hub REPS WITH FRIENDS Β· DOCUMENTS v1.1.0

RWF β€” Timeline & Achievable Goals

2 Sep 2026 Β· v1.1 baseline. The plan pairs with the contract milestones (docs/RWF_Contract_Scope.pdf) β€” dates assume Ben engages this week.

Where we are (v1.1, today)

Done: engine + parity tests Β· v1 app (65 screens, power-ups, DZ, daily winner, seasons) Β· v2 board-game app (poker-table Γ— track, cards, kitty, 13 themes) Β· points currency + draft-from-3 + reroll-to-kitty + catch-up curve Β· multi-squad dashboard + wagers Β· SFX layer Β· WhatsApp/Slack bots Β· Beeper transport (needs token) Β· Android app on the phone Β· avatar systems (Geno mocap, wardrobe, frogs, anyCreature, img2threejs foundry verdict) Β· public coverage hub (rwf.qalarc.com/v1).

Weeks 1–2 β€” M1: One system (contract Milestone 1)

Weeks 3–4 β€” M2: Always-on + real verification (Milestone 2)

Weeks 5–8 β€” Pilot (contract Pilot milestone)

Weeks 9–12 β€” Post-pilot: the money + the store

Standing goals (every phase)

What would make each phase FAIL (be honest early)


UPDATE 2 Sep (evening) β€” new points recorded from founder directives